Skip to content
Free Indian Tools

Daily · Free tool

Solar Panel ROI

PM Surya Ghar Yojana (2024) gives 30-40% subsidy on rooftop solar. Average generation: 4 kWh per kW per day (Indian sunshine). Payback typically 4-7 years; panels last 25+.

3 kW
₹60,000
35%
₹8
Payback
3.3 yrs
Gross cost₹1,80,000
Net cost (post subsidy)₹1,17,000
Annual saving₹35,040

FAQ

Net metering — is my state on board?

All states allow net metering. Excess generation sold back to grid. Approval: 30-90 days from application.

Maintenance cost?

Annual cleaning ₹2-3k. Inverter replacement at year 10-12: ₹40k. Total ~3-5% of original cost over 25 years.

When to install?

Now. PM Surya Ghar subsidy 30-40% (up to ₹78k for 3kW). Tariffs only go up.